Septic Sysytem Design Bolivia

CE4905 Senior Design 2003
Slide Show Scenes of 2003 Projects


Figure 2
<
   

THE PLAN

  • Design a Complete Septic System for a
    Future School of 500 Students
  • Include Local Building Practices
    in the Design
  • Secure Funding, Materials and Labor
  • Build the Septic Tank, Sedimentation
    Basin and Adsorption Field


Figure 3
 

THE DESIGN

Three Steps to Clean Waste

1. Two Chamber Septic Tank
2. Sedimentation Basin
3. Adsorption Field

 


Figure 4
  SEPTIC TANK DESIGN

Two compartment tank provides better
suspended solids removal
2.2 Gallons H20/student/day
Detention Time = 48 hrs
Tank Volume = 2,200 gal = 294 ft3
Tank Dimensions = 6’ x 13’ x 4’


 
 

SEDIMENTATION BASIN


Volume = 740 ft3

Dimensions:
Diameter= 6.5 ft
Height = 7 ft

Slide Show Scenes of 2003 Projects

  ADSORPTION FIELD 

Percolation rate = 4.5 min/in of fall
Max rate of sewer application
= 2.42 gal/ft2/day
Expected flow = 1,100 gal/day
Area for adsorption = 460 ft2
Trench Length = 170 ft

  Michigan Technological University
Department of Civil and Environmental Engineering
1400 Townsend Drive
Houghton, Michigan, 49931 - 1295, USA
Department Phone: 1-906-487-2520
Department Fax: 1-906-487-2943
Department E-mail: cee@mtu.edu
 


© 2004 Michigan Technological University
The sale or commercial use of Illustrations, photographs and graphic images presented on this site is not permitted. Educational uses are permitted, provided credit is given to sources.