The objective of this course is to introduce students to the basics of construction scheduling. Topics covered will include:
- Fundamentals of different scheduling methods such as Critical Path Method and linear scheduling
- Resource allocation and leveling in schedules
- Schedule monitoring and control methods
- Integrating cost and schedule and assessing time-cost trade-offs
- Schedules in contracts and dispute resolution
- Constraints and uncertainty in scheduling: Introduction to construction simulations