Problem Statement:

The Bolivian Methodist Church is in need of an engineering study for the development of a recently purchased site. The overall plan for the site is to build a new church seating 80-100 people. The following items were developed through a feasibility study: 2-3 building site options Scale drawing of site Topographical map Scale drawing of interior of church Truss analysis

Local church used as reference Photo of Site

Wind Calculations
Truss Analysis
Specs
Sizing of Members

Design Work Performed (jpg)




Truss Analysis


Final Truss chosen out of Three options

Local Building Codes

  • Parking must be provided (2.5m x 3m)
  • Sidewalk must be provided (1.8m wide)
  • Septic tank must be accessible
  • Existing and proposed buildings must be 6m from street property line
  • Buildings must not occupy more than 40% of any property line.
  • Water must not drain onto adjacent property
  • Buildings not constructed against existing walls must be at least 3m from walls
Original Site
Topographical Map
Proposed Site Layout 
 
Proposed Interior Layout

Slide Show Scenes of 2003 Projects
   

 

Michigan Technological University
Department of Civil and Environmental Engineering
1400 Townsend Drive
Houghton, Michigan, 49931 - 1295, USA
Department Phone: 1-906-487-2520
Department Fax: 1-906-487-2943
Department E-mail: cee@mtu.edu
 


© 2004 Michigan Technological University
The sale or commercial use of Illustrations, photographs and graphic images presented on this site is not permitted. Educational uses are permitted, provided credit is given to sources.