|
Louis Verrette Construction Materials Laboratory |
|
|
| B005
Dillman Hall |
| This lab
contains state of the art equipment giving students and faculty a
full range of material testing capabilities.Included in this lab are
electromechanical and servohydraulic universal test systems, a fully
equipped concrete mix room and a temperature/humidity controlled curing
room. |
| |
Michigan
Technological University
Department of Civil and Environmental Engineering
1400 Townsend Drive
Houghton, Michigan, 49931 - 1295, USA
Department Phone: 1-906-487-2520
Department Fax: 1-906-487-2943
Department E-mail: cee@mtu.edu
|